WF-14 · Step 1
Info
Project picker, cost code, title, rich text description, multi-date pills, photos/docs (0/50). EXIT/SAVE header.
Step 1 of 5 — Info
Riverside Office Complex
Tap to edit... ✎ Full-screen
Mar 28 × Mar 29 × Mar 30 ×
Photos & Documents 0 / 50
📷
Camera
🖼
Gallery
📃
Files
WF-15 · Step 2
Labor
Qty of Workers, 5 hour columns (ST, OT, DT, PT, POT), per-row Date picker. Trade badge and auto-calc rates.
Step 2 of 5 — Labor
Journeyman
ST
OT
DT
PT
POT
Rate: $85.00/hr × 1 worker$935.00
Apprentice
ST
OT
DT
PT
POT
Rate: $55.00/hr × 1 worker$605.00
Labor Subtotal$1,540.00
WF-16a · Step 3
Material
Card-based material entries. 3-way add bottom sheet: Select from Catalog, Add Blank Row, Bulk Edit.
Step 3 of 5 — Material
5-ton condenser unit
UoM
Qty
Unit Cost
$2,400.00
Copper refrigerant line set
UoM
Qty
Unit Cost
$500.00
Select from Catalog • Add Blank Row • Bulk Edit
Material Subtotal$2,900.00
WF-16b · Step 4
Equipment
Same card pattern as materials with 3-way add bottom sheet for equipment catalog.
Step 4 of 5 — Equipment
Crane — 20 ton mobile
Pieces
UoM
Rate
$350.00
Select from Catalog • Add Blank Row • Bulk Edit
Equipment Subtotal$350.00
WF-19 · Step 5
Summary
Full read-only recap of ALL data. Preview Tag and Prepare Signatures buttons.
T&M Tag Summary
ProjectRiverside Office Complex
Cost CodeMC-4200
T&M Tag TitleCondenser Unit Replacement
DescriptionReplaced failed 5-ton condenser unit on rooftop...
Dates of WorkMar 28, Mar 29, Mar 30
Customer RefPO-2026-0847
Photos & Docs 3 / 50
IMG
IMG
IMG
Labor
WorkerQtySTTotal
Mike S.18.0$935.00
Jesse T.18.0$605.00
Labor Subtotal$1,540.00
Materials
ItemQtyTotal
5-ton condenser unit1$2,400.00
Copper refrig. line40$500.00
Material Subtotal$2,900.00
Equipment
ItemPiecesTotal
Crane — 20 ton mobile1$350.00
Equipment Subtotal$350.00
Other
No other items
Grand Total $4,790.00
WF-20 · Signatures
Prepare Signatures
Sign yourself, add signers with ordering, compose email message, send signed copies. Collect signatures flow.
Prepare Signatures

Sign your T&M Tag

Mike Sullivan

Signers

Signing Order
ON
1
David Chen
Riverside Development Corp.
d.chen@riversidedev.com
REQUIRED
2
Sarah Mitchell
Riverside Development Corp.
s.mitchell@riversidedev.com
OPTIONAL

Email message to signers

Send signed copy to:

mike@rrmech.com × office@rrmech.com × + Add
SelectionSlideup · Overlays
Selection Slideup Overlays
Bottom-sheet pickers for Company, Trade Level, Material, Equipment, Project, and the 3-Way Add Bottom Sheet.
Company Picker

Select a Company

RR Mechanical
ProElectric
Rival Insulation
Summit HVAC
Northwind Plumbing
Atlas Controls
Trade Level Picker

Select Trade Level

Foreman$105.00/hr
Journeyman$85.00/hr ✓
Apprentice 4th Year$65.00/hr
Apprentice 3rd Year$55.00/hr
Apprentice 2nd Year$45.00/hr
Apprentice 1st Year$38.00/hr
Laborer$35.00/hr
Material Picker

Select Material

5-ton condenser unit$2,400/ea
Copper refrigerant line set$12.50/lf
R-410A refrigerant$18.00/lb
Thermostat — programmable$89.00/ea
Duct tape (HVAC grade)$8.50/roll
Equipment Picker

Select Equipment

Crane — 20 ton mobile$350/day ✓
Scissor lift$175/day
Boom lift — 60ft$425/day
Portable welder$85/day
Air compressor — 185 CFM$120/day
Project Picker NEW

Select Project

Riverside Office Complex
Metro Center Renovation
Lakewood Residential Phase 2
Downtown Parking Garage
Hillcrest Medical Center
3-Way Add Bottom Sheet NEW

Add Item

📚
Select from Catalog
Browse and pick from your saved items
Add Blank Row
Enter item details manually
Bulk Edit PRO
Add or edit multiple items at once